Evaluting the risks of using the principles of value engineering in implementing civil projects.

  • Youssef Nikfard
  • Mahdi Baniasadi.
Keywords: management, risks and obstacles, utilization of value engineering, civil projects, Topsis Multi-criteria Decision-Making Methodology

Abstract

In this article, we tried to evaluate the most important risks of the application of civil projects and to prioritize them based on the identified risks, and then provide solutions to address these risks. The results of the research show that the six main factors (1) the general factors, (2) the factors of the law, (3) the structural factors, (4) the factors of the field of advisers, (5) the factors of the phase of the preparatory studies, and (6) factors of the phase of value engineering studies are considered as the main risks identified in the application of value engineering in civil projects.